Go Back   Maxum Boat Owners Club - Forum > Maxum General > Projects and Customisations
Click Here to Login
Register FAQ Community Calendar Today's Posts Log in

Reply
 
Thread Tools Search this Thread Display Modes
 
Old 02-15-2011, 05:36 AM   #1
Commander
 
Join Date: May 2008
Location: Seattle
Posts: 291
Default How about this for a winter project?

My original plan:
Haul boat, service drive and repaint drive.

Well, looks like a can of worms were opened up.

Once it is all said and done, here is what must be done:

NEW TRANSOM ASSY. BRAVO MAGNUM
GIMBAL HOUSING R&R // PULL ENGINE AND INSTALL FACTORY NEW GIMBAL HSG ASSY.
R&R ZINCS/ANODES
OUTDRIVE PAINT COMPLETE INCLUDING COATING THE NEW GIMBAL HSG.
NEW MERCATHODE CONTROL UNIT SYSTEM
PORT EXHAUST MANIFOLD & ELBOW & EXTENSION R&R AND REAL RISER ON OTHER SIDE
INSTALL A FACTORY REMAN UPPER GEAR HSG
LOWER UNIT REPLACMENT

Looks like I just got a new boat, kinda......
__________________

rgreenwell8962 is offline   Reply With Quote
Old 02-15-2011, 07:07 AM   #2
Moderator

 
shrew's Avatar
 
Join Date: Apr 2008
Posts: 5,690
Default

Zincs/Anodes? You didn't want to build a drive around the the old zoncs? At least you got some piece of mind.
shrew is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Powered by vBadvanced CMPS v3.2.3

All times are GMT. The time now is 08:25 AM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.